inknix

Clear production for screen and stage

← Journal
Workflow Costs

What Production Workflow Planning Costs and What Moves the Price

A plain account of how workflow planning is priced, which parts of a job add hours, and what a written quotation from us normally lists before any work starts.

Oliver Hartley

5 minutes to read

What Production Workflow Planning Costs and What Moves the Price

What you are actually paying for

Workflow planning is mostly time spent thinking, drawing and checking, so the price follows hours rather than equipment. When a network team or an event producer asks us for a plan, they receive three things: a schedule that shows who does what and when, a signal flow diagram that traces every picture and sound feed from source to destination, and a handover document that a crew can pick up without us in the room.

Each of these takes real effort to get right. A schedule has to be walked through with the people who will follow it, and a diagram has to be redrawn whenever someone changes a camera position or adds a feed. Hannah Roper, who leads this work, will often spend as long listening to a crew describe their habits as she does drawing.

That is why we avoid a single headline figure. Two projects that both say workflow planning on the enquiry can differ by several days of work once the detail is on the table.

  • Schedule covering prep, rehearsal, transmission and wrap
  • Signal flow diagram for pictures, sound and communications
  • Handover document written for the crew who will use it

The size of the production sets the base

The number of sources is the first thing that moves the price. A two camera interview programme with one audio mix is a short job. A multi camera studio show with remote contributors, playback and a separate feed for the network needs a longer diagram, more checking and a more detailed schedule.

Duration matters too. A single day event can be planned in a handful of sessions, while a weekly series needs a plan that holds up across many recordings and several crew changes. In that case we write the handover document with more care, because the person reading it in week ten may not have been there in week one.

We ask about both at the start, since they let us give a realistic written quotation instead of a rough guess that has to be revised later.

How many people need to agree

The number of parties involved drives cost more than most clients expect. When one producer owns every decision, the plan comes together quickly. When a network, a venue, a facilities company and an external lighting crew each hold part of the answer, a good share of the work becomes coordination: collecting requirements, spotting where they conflict and getting a decision recorded in writing.

None of that is wasted effort. Unresolved disagreements about who supplies a feed or who controls a cue tend to surface on the day, when they are most expensive to fix. We would rather find them on paper.

If you can name a single person who can approve choices for your side, tell us at the enquiry stage. It often shortens the plan noticeably.

Existing documents help, or hinder

Starting from good material saves time. If you already hold a venue plan, a previous running order or an earlier signal diagram, we can build on it and check it against what is true now. Those documents are rarely wrong in every respect, but they are often out of date in the places that matter, such as a changed patch or a replaced piece of equipment.

Starting from nothing is perfectly workable, though it adds survey and interview time. We may ask to visit the studio or venue, or to speak with the engineers who know how the space behaves.

Where old paperwork conflicts with itself, expect extra hours to reconcile it. We tell you this in the quotation rather than after the fact.

  • Venue or studio plans
  • Previous running orders
  • Earlier signal flow diagrams
  • Equipment lists with current model details

Revisions and late changes

Plans change, and a fair price allows for that. Our quotation states how many rounds of revision are included, usually one full review with your team after the first draft and a final check before handover. A small correction, such as renaming a source, costs very little. A change that alters the structure, such as moving from one control room to two, means reworking the diagram and the schedule together.

Changes that arrive close to transmission are the hardest to absorb, because every connected document has to be checked again. We would rather do that calmly than hurriedly, and we say so up front.

If you expect the brief to shift, say so. We can build the plan in stages so that early decisions are fixed and later ones remain open.

How an order and payment work

The process is simple and entirely in writing. You send an enquiry through the contact page describing the production, the number of sources and the dates. We reply with questions if anything is unclear, then issue a written quotation that lists what is included and what would change the figure.

Once you confirm the quotation in writing, we begin work and raise an invoice, which you pay by bank transfer. Nothing is bought on the website itself.

If plans change after confirmation, cancellations and refunds follow our payment and refund policy, which you can read before you commit. The Prices page sets out current figures for each service in pounds sterling, including workflow planning, so you can see the scale before you write to us.

The cost of workflow planning comes down to a few honest factors: how many sources there are, how long the production runs, how many people must agree, what paperwork already exists and how much will change along the way. Tell us about those five and we can put a clear written quotation in front of you. If something is uncertain, we say so and plan around it, rather than hiding it inside a vague total.